Lower Yahara River Trail P2 - Fish Camp County Park Improvements project photo of the paved path.

Lower Yahara River Trail Phase 2 & Fish Camp County Park Improvements – Design

KL Engineering worked with Dane County to design Phase 2 of the Lower Yahara River Trail. This 1.6-mile trail begins at a new trailhead at Fish Camp County Park, spans the Door Creek Wetlands Wildlife Area with a boardwalk and a bridge over Door Creek, and extends through Lake Kegonsa State Park. Archaeological sites were […]

Lower Yahara River Trail Phase 2 & Fish Camp County Park Improvements – Design Read More »

USH 8 Trail in Wisconsin

USH 8 Trail Feasibility Study

With assistance from a WisDOT planning grant, KL Engineering worked with the Forest County Potawatomi Community (FCPC) to develop a feasibility study to add bicycle and pedestrian facilities along USH 8 in Forest County, WI. The 4.5-mile multi-modal route, called the Pathway to Wellness, would span from S. Prospect Avenue to Otter Creek Road. The

USH 8 Trail Feasibility Study Read More »

Greenfield Power Line

Greenfield Powerline Trail

KL Engineering is working with the City of Greenfield, WI to design phase one of a major eats-west corridor that will add significant multi-modal connections throughout the southwest region. This 3-mile trail begins at the Oak Leaf Trail and follows West Cold Spring Drive east, then turns north and utilizes an existing We Energies Corridor

Greenfield Powerline Trail Read More »

Walking path in Greenfield, Wisconsin

Greenfield Bike & Pedestrian Plan

KL Engineering worked in partnership with the City of Greenfield, WI to provide an update to their 2008 Bike & Pedestrian Plan. The City Engineer and Parks Director had a renewed interest in developing these community-wide facilities and updating this document was critical to building this network. Although urban, Greenfield sidewalks in residential neighborhoods are

Greenfield Bike & Pedestrian Plan Read More »

Garver Path in Madison, Wisconsin

Garver Path

KL Engineering worked with the City of Madison, WI to design a 1-mile connector trail from the Capital City Path to the northeast side of Madison. The project runs through the newly redeveloped Garver Feed Mill property and O.B. Sherry Park. The design incorporates a 10-foot-wide asphalt trail, with two 14-foot-wide prefabricated steel truss bridges

Garver Path Read More »

Forest County Potawatomi Community Bicycle & Pedestrian Path

Forest County Potawatomi Community Bicycle & Pedestrian Plan

KL Engineering worked in partnership with Forest County Potawatomi Community (FCPC) and North Central Wisconsin Regional Planning Commission (NCWRPC) to develop a comprehensive bicycle and pedestrian plan to enhance the viability of bicycling and walking as forms of transportation throughout the Forest County Potawatomi Community in Forest County, WI. KL Engineering assisted NCWRPC and FCPC

Forest County Potawatomi Community Bicycle & Pedestrian Plan Read More »

Elroy Sparta Trail Bridge Rehabilitation

Elroy Sparta Trail Repair

In 2018 as a result of heavy rains and flooding along the Elroy-Sparta Trail in Elroy, WI, several structures and trail segments were damaged and closed. KL Engineering performed structure inspections for all 49 of the trail structures between Norwalk and Elroy. Each structure was visually inspected and evaluated for weight limits according to the

Elroy Sparta Trail Repair Read More »

New Shared Use Trail along CTH C in Kenosha County, Wisconsin

CTH C Shared Use Path

This 1.0-mile trail travels through the front yards of 13 neighbors and was built along the rural cross-section of CTH C in Pleasant Prairie, WI. In addition to the standard 10-foot-wide asphalt trail, the project includes a 175-foot clear-span prefabricated multi-use bridge and 300 feet of boardwalk. The trail project required extensive public involvement with

CTH C Shared Use Path Read More »