KL Engineering Logo

Author name: Ryan S

Kelly Greuel, PE, PTOE – New Traffic Engineer

We welcome Kelly Greuel to the KL Family! Kelly brings 10 years of experience to our Traffic Engineering department in Madison. Her design background includes traffic signals, Intelligent Transportation Systems (ITS), street lighting, and intersection safety. Kelly is UW-Madison graduate and a board member for the Institute of Transportation Engineers (ITE) and the American Society of

Kelly Greuel, PE, PTOE – New Traffic Engineer Read More »

a street in Independence, WI

STH 93 | City of Independence, WI

KL Engineering designed a 1.3 mile urban section of STH 93 between A Street and Indee Blvd in the City of Independence, Trempealeau County.  The engineering design for the reconstruction included roadway, detour route, bridge, retaining walls, and sanitary sewer and water main.  Project also includes new/replacement street lighting, sidewalk reconstruction, storm sewer system upgrades,

STH 93 | City of Independence, WI Read More »

a divided highway

Rural Reconstruction – STH 31, Racine County

KL Engineering completed the design of this two-mile segment of STH 31 in Racine County, which expanded STH 31 from a two-lane rural roadway to a four-lane roadway. Four design alternatives were evaluated and presented to the public. The selected alternative constructed two southbound travel lanes of the four-lane alternative. The two lanes were designed

Rural Reconstruction – STH 31, Racine County Read More »

Urban Rehabilitation- South Business Drive, Sheboygan

Urban Rehabilitation- South Business Drive, Sheboygan

As prime consultant for WisDOT Northeast Region, KL Engineering completed the redesign of STH 28 (South Business Drive) in the City of Sheboygan. [metaslider id=”773″] The project included reconstructing the westbound lanes for approximately one-third of a mile, and overlaying the remaining 1.2 miles of the project; adding raised medium and turn lanes; traffic signals

Urban Rehabilitation- South Business Drive, Sheboygan Read More »

CTH C Shared-Use Trail

CTH C Shared-Use Trail

Project Overview Type: Parks, Trails & Recreation – Construction Oversight Client: Kenosha County KL’s Role: Prime Consultant Location: Kenosha County, Wisconsin Limits: 114th Ave – Bain Station Rd (Pleasant Prairie) Length: 1 mile Construction Complete: July 2020 Construction Cost: $1.52 Million Project Elements WisDOT Non-Traditional Project   Trail Construction Oversight Submittals review Materials testing Field Inspection

CTH C Shared-Use Trail Read More »

As KL’s COO, Scott Cramer leads KL with deeply rooted integrity balanced with a drive to have fun. He’s a natural born coach – both in the office and on the field.   Check out this great podcast that features him: https://twitter.com/TheFallGuysPod/status/1395695868351631365

Read More »