Project Overview

Type:Parks, Trails & Recreation – Construction Oversight
Client:Kenosha County
KL’s Role:Prime Consultant
Location:Kenosha County, Wisconsin
Limits:114th Ave – Bain Station Rd (Pleasant Prairie)
Length:1 mile
Construction Complete:July 2020
Construction Cost:$1.52 Million

Project Elements

  • WisDOT Non-Traditional Project  
  • Trail Construction Oversight
  • Submittals review
  • Materials testing
  • Field Inspection
  • Progress meetings & reporting
  • Significant storm sewer field modifications
  • Public involvement
  • Multi-jurisdictional coordination
  • Federal, state and local permit oversight
  • Trail, boardwalk & bridge inspection
  • Added roadway improvements
  • Added County-staffed trail work
  • Pay application & contract modification processing

I have been extremely impressed with KL Engineering performance and level of service on the CTH C trail project. The KL Engineering professionalism, proactiveness and high level of attention to details are the main reasons why the CTH C trail project is a high-quality product. KL Engineering knows what it takes to manage a complex project. KL Engineering customer service is exemplary. The County looks forwarding to working with KL Engineering on numerous projects in the future. What an awesome KL Engineering team!

~ Clement Abongwa | Highway Commissioner | Kenosha County

This 1.0-mile trail travels through 13 neighbors’ front yards and was built along the rural cross-section of CTH C. In addition to the standard 10-foot-wide asphalt trail, the project includes a 175-foot clear-span pre-fabricated multi-use bridge and 300-foot of boardwalk approaches. 

The trail also incorporated extensive public involvement with alternative alignments, tie-in with Pleasant Prairie’s future trail extension, significant utility coordination / relocation, a boardwalk within wetlands, and stormwater modifications.

Full roadway closure and alternative detouring was accomplished through strong interagency coordination and extensive public outreach. KL Engineering assisted in the collaboration between the contractor and utilities for project scheduling when it came to light that all the utility relocations had not occurred as per the utility agreements.

Lynda Fink and Travis Brush led the construction oversight on the project.

Share This Story

Related

NEWS

Graphic with 'Don't waste food' spelled out with photos of fruit forming the letters on green back ground with orange at the bottom and 'Think before your throw out!' message with KL logo.
Graphic of KL employee Scott DeMeuse and his daughter and dog out on a walk. 'Make it a family affair!' text and American Heart Association logo.
Blue background with golden geometric star shapes, one with KL logo in center. Text reads 'To Our Ops Group, Thank you for everything!"

Celebrating Staff