IH 94 | Dunn & St. Croix Counties

KL Engineering provided the project leader and staff for the $60 million reconstruction of IH 94 between STH 128 and 250th Street Dunn & St. Croix Counties, WI, which included the Knapp Hill portion. Specific work included grading for temporary widening and temporary median roadway, temporary asphalt paving, 3 temporary bridges, removals, common, borrow, select

IH 94 | Dunn & St. Croix Counties Read More »

IH 39 bridge

IH 39 Central Segment

KL Engineering was the prime engineering consultant for the design of 13 miles of IH 39 from County Highway O to the Rock / Dane County line in Wisconsin. The interstate was completely reconstructed and expanded to eight lanes from County O to STH 26 and six lanes from STH 26 to the Rock /

IH 39 Central Segment Read More »

Greenfield Power Line

Greenfield Powerline Trail

KL Engineering is working with the City of Greenfield, WI to design phase one of a major eats-west corridor that will add significant multi-modal connections throughout the southwest region. This 3-mile trail begins at the Oak Leaf Trail and follows West Cold Spring Drive east, then turns north and utilizes an existing We Energies Corridor

Greenfield Powerline Trail Read More »

Walking path in Greenfield, Wisconsin

Greenfield Bike & Pedestrian Plan

KL Engineering worked in partnership with the City of Greenfield, WI to provide an update to their 2008 Bike & Pedestrian Plan. The City Engineer and Parks Director had a renewed interest in developing these community-wide facilities and updating this document was critical to building this network. Although urban, Greenfield sidewalks in residential neighborhoods are

Greenfield Bike & Pedestrian Plan Read More »

Garver Path in Madison, Wisconsin

Garver Path

KL Engineering worked with the City of Madison, WI to design a 1-mile connector trail from the Capital City Path to the northeast side of Madison. The project runs through the newly redeveloped Garver Feed Mill property and O.B. Sherry Park. The design incorporates a 10-foot-wide asphalt trail, with two 14-foot-wide prefabricated steel truss bridges

Garver Path Read More »

Garver Path bridge

Garver Path Bridges

KL Engineering worked with the City of Madison, WI to design a 1-mile connector trail from the Capital City Path to the northeast side of Madison running through the Garver Feed Mill redevelopment area and O.B. Sherry Park. The design incorporated a 10-foot-wide asphalt trail, two 14-foot-wide prefabricated steel truss bridges, and a wetland crossing

Garver Path Bridges Read More »

Forest County Potawatomi Community Bicycle & Pedestrian Path

Forest County Potawatomi Community Bicycle & Pedestrian Plan

KL Engineering worked in partnership with Forest County Potawatomi Community (FCPC) and North Central Wisconsin Regional Planning Commission (NCWRPC) to develop a comprehensive bicycle and pedestrian plan to enhance the viability of bicycling and walking as forms of transportation throughout the Forest County Potawatomi Community in Forest County, WI. KL Engineering assisted NCWRPC and FCPC

Forest County Potawatomi Community Bicycle & Pedestrian Plan Read More »

Elroy Sparta Trail Bridge Rehabilitation

Elroy Sparta Trail Repair

In 2018 as a result of heavy rains and flooding along the Elroy-Sparta Trail in Elroy, WI, several structures and trail segments were damaged and closed. KL Engineering performed structure inspections for all 49 of the trail structures between Norwalk and Elroy. Each structure was visually inspected and evaluated for weight limits according to the

Elroy Sparta Trail Repair Read More »

Aerial Photo of Dutch Mill Park & Ride

Dutch Mill Park & Ride

This parking lot expansion in Madison, WI added approximately 100 parking spaces to an area west of the existing lot. It was designed to integrate with the parking lot of the adjacent businesses, while also maintaining a circulating flow of traffic separate from the adjacent businesses. LED lighting was installed throughout the existing and expanded