Kenilworth Building Receiving Area
KL Engineering completed the design for repaving of the receiving area and storm pump replacement at the Kenilworth Building on the University of Wisconsin–Milwaukee campus. The project addressed a reoccurring stormwater flooding problem in the basement of the Kenilworth Building. A larger capacity pump replaced the existing stormwater pump inside the building, which is used to […]