KL Engineering Logo

PORTFOLIO

Construction Management

Water Street Bridge | City of Eau Claire

CLIENT

WisDOT Northwest Region

LOCATION

Eau Claire, Wisconsin

LIMITS

Over the Chippewa River

DATES

August 2015 – November 2016

KL Contact

Jim Dzienkowski, PE

Project Details

  • Construction Management
  • Construction Observation
  • Construction Documentation
  • Field Layout / Survey
  • Field Modifications
  • Quantity Measurement
  • Project Cost Accounting
  • Material Compliance
  • Public Involvement
  • Stakeholder Coordination

$7.1 million Bridge over Chippewa River

KL Engineering provided the project leader and staff for the $7.1 million Water Street Bridge project over the Chippewa River in the City of Eau Claire, WI.

The project included the replacement of the existing steel girder structure with a wider concrete girder structure to accommodate vehicles, bicycles, and pedestrians.

Specific work items included removals, grading, base aggregate, asphaltic surface, B-18-0219, riprap, erosion control, restoration, signing, traffic control, pavement marking, traffic signals, lighting, and incidentals.

Water Street Bridge | City of Eau Claire [Photos]

RELATED

PROJECTS