KL Engineering provided the project leader and staff for the $7.1 million Water Street Bridge project over the Chippewa River in the City of Eau Claire, WI.
The project included the replacement of the existing steel girder structure with a wider concrete girder structure to accommodate vehicles, bicycles, and pedestrians.
Specific work items included removals, grading, base aggregate, asphaltic surface, B-18-0219, riprap, erosion control, restoration, signing, traffic control, pavement marking, traffic signals, lighting, and incidentals.