KL Engineering Logo

Portfolios

Plan for US 18/151 Freeway

US 18/151 Freeway Conversion

For the past 7 years, KL Engineering has performed ‘on-call’ services in three WisDOT Regions in the state. The surveys have included urban and rural reconstruction projects, roadway culvert replacements, structure surveys for structure replacement projects and aerial target monumentation for planimetric mapping.

US 18/151 Freeway Conversion Read More »

STH 73 Bridge

STH 73 Bridge

KL Engineering designed improvements to the STH 73 bridge over the North Fork Eau Claire River in Taylor County, Wisconsin. This project was designed on an accelerated schedule, taking it from preliminary design to PS&E in just four months. The bridge deck was widened and replaced for a single span 36-inch prestressed girder bridge. Built

STH 73 Bridge Read More »

STH 67 (Summit Avenue)

KL Engineering completed the design for the reconstruction and expansion of 2.5 miles of STH 67 from Blue Ribbon Drive to Thackeray Trail in the Village of Summit and City of Oconomowoc in Waukesha County, WI. The project reconstructed and expanded STH 67 from a 4-lane rural roadway to a 6-/8-lane transitional roadway from IH

STH 67 (Summit Avenue) Read More »

STH 64 Bridge

STH 64 Bridge

KL Engineering designed improvements to the STH 73 bridge over the North Fork Eau Claire River in Taylor County, WI. Built in 1983, the existing deck had suffered through many northern winters and was starting to show its age. The advanced deterioration of the edge of the deck was a safety concern with crumbling concrete

STH 64 Bridge Read More »

STH 170

STH 170 (Glenwood City – Colfax) | Dunn & St. Croix Counties

KL Engineering performed the survey for this 7.5-mile urban and rural roadway resurfacing project between Glenwood City and Boyceville, WI. KL survey crews completed topographic and supplemental surveys, and utility and boundary surveys for multiple intersections, beam guard upgrade locations, and superelevated roadway sections along the project corridor and approximately 50 curb ramps. This project

STH 170 (Glenwood City – Colfax) | Dunn & St. Croix Counties Read More »

Quilt Block Wind Maintenance Facility

Quilt Block Wind Maintenance Facility

KL Engineering completed the site design and survey for the development of a maintenance facility that services the Quilt Block Wind site in the Darlington Industrial Park. The site was undeveloped with significant topographic relief. Project challenges included: Determining the floor elevation of the building to balance excavation. Locating and designing functional driveways for passenger

Quilt Block Wind Maintenance Facility Read More »

a roundabout near North Fish Hatchery Road in Fitchburg, Wisconsin

North Fish Hatchery Road (CTH D) Corridor Improvements

Fish Hatchery Road and Greenway Cross Intersection in Fitchburg, Wisconsin KL Engineering designed improvements for a 1.5-mile reconstruction project along North Fish Hatchery Road between CTH PD and the West Madison Beltline. The project included safety and capacity updates to multiple intersections, an extensive public involvement campaign, and a comprehensive drainage analysis for the roadway

North Fish Hatchery Road (CTH D) Corridor Improvements Read More »

Fish Hatchery Road in Fitchburg, Wisconsin

North Fish Hatchery Road (CTH D) Corridor Oversight

Fish Hatchery Road serves as the gateway into the heart of Fitchburg, WI’s business community. The project redesigned the corridor’s segment south of the Beltline (USH 12/14) and included eight existing intersections and created two new additional intersections. These improvements led to better traffic flow, updated multi-use accommodations, and helped spur development along the corridor.

North Fish Hatchery Road (CTH D) Corridor Oversight Read More »