KL Engineering has performed the survey for this 7.5-mile urban and rural roadway resurfacing project between Glenwood City & Boyceville KL Survey Crews completed topographic and supplemental surveys, utility and boundary surveys for multiple intersections, beam guard upgrade locations, and superelevated roadway sections along the project corridor and approximately 50 curb ramps.
This project also includes the reconfiguration and the intersection in Boyceville to include traffic signals with safety pre-emption for a nearby train crossing