Garver Path Bridges
KL Engineering worked with the City of Madison, WI to design a 1-mile connector trail from the Capital City Path to the northeast side of Madison running through the Garver Feed Mill redevelopment area and O.B. Sherry Park. The design incorporated a 10-foot-wide asphalt trail, two 14-foot-wide prefabricated steel truss bridges, and a wetland crossing […]











