Author name: Erin Starks

2024 UW-Platteville Spring Career Fair

Many thanks to Brad Halvensleben, Garrett Ruckdashel, and Eric Andritsch who connected with folks at the UW-Platteville Career Fair on 2/7 in Ullsvik Hall. Our full-time entry-level openings include a Construction Engineer (Menomonie office), Traffic Engineer (Madison preferred), and Design Engineer (any KL office). We also offer great Student Internships or Co-Op opportunities in Design or Traffic (Madison preferred).

2024 UW-Platteville Spring Career Fair Read More »

Photo of Bill with KL logo, Welcome text, and star design on orange background.

Welcome, Bill Hove!

We are excited to welcome Bill Hove, PE, SE to KL Engineering as a Senior Technical Leader – Infrastructure Services. Bill will be working within our structures team in our Madison office. He brings 30 years of structural engineering experience. Bill is both a UW-Madison (Civil Engineering) and UW-Platteville (Building Construction Management) alum. Welcome to

Welcome, Bill Hove! Read More »

Photo collage of the in progress and finished project along with project and award title and WisDOT logo.

2023 WisDOT Outstanding Highway Construction Award for Asphalt Paving

Congratulations to Monarch Paving, Cooper Engineering, and WisDOT Northwest Region on winning the 2023 WisDOT Outstanding Highway Construction Award for Asphalt Paving! KL Engineering’s Chris Ehlert was the acting WisDOT Project Manager overseeing construction on the USH 63 project from Baldwin to Cumberland in Polk County. Monarch Paving provided an outstanding project with excellent ride

2023 WisDOT Outstanding Highway Construction Award for Asphalt Paving Read More »

Photo collage of the in progress and finished project along with project and award title and WisDOT logo.

Little Suamico River Bridge Project – Award Finalist

The Little Suamico River Bridge provides passage for high volumes of traffic during summer months. It was deteriorating and nearing unsafe conditions for the traveling public. The two-lane, three-span structure required staged reconstruction during the winter months to prepare for a pavement replacement project in the spring. This posed many unique challenges and opportunities for

Little Suamico River Bridge Project – Award Finalist Read More »