KL Offices Closed Due to Extreme Weather
Due to the extreme weather in Wisconsin this week, all of our KL Engineering offices will be closed until Thursday, 1/31 at noon.
Due to the extreme weather in Wisconsin this week, all of our KL Engineering offices will be closed until Thursday, 1/31 at noon.
We are proud of our KL family for all of their donations to the 2018 NBC 15 Share Your Holidays to eliminate hunger campaign! We raised enough money to feed 3 families (4 people / 3 meals a day) for an entire year! Many thanks to all who donated to this special cause!
Congratulations to Matt Regnier, PE, PTOE, who is now certified as a Road Safety Professional (Level 1)! He was in the inaugural class of RSP professionals who in the performance of their work make decisions that potentially impact the safety of the traveling public. The Transportation Professional Certification Board (TPCB) in collaboration with a wide
This week we welcomed Matt Lee into our KL Engineering family! Matt is a Surveyor based out of our Madison office. He brings 10 years of experience to our survey team! We’re excited to have you!
We celebrate Ryan Schanhofer, PE on his 10 year anniversary at KL Engineering! He is our Senior Vice President and has 20 years experience in transportation and construction engineering. Congratulations, Ryan!
We are excited to have Lynda Fink, PLA join our KL Family! Lynda is a Professional Landscape Architect with 20 years of experience in design, construction and real estate. She will be leading our new Parks, Trails, and Recreation department and will be establishing KL’s new Southeast Wisconsin office.
We celebrate Mike Scarmon, PE, PTOE on his 15 year anniversary at KL Engineering! He is a Senior Project Manager and oversees our Traffic Engineering department. Mike has 18 years experience in transportation design and works in our Madison office. Congratulations, Mike!
Type: Reconstruction Client: City of La Crosse KL’s Role: Prime Consultant Location: La Crosse County, Wisconsin Limits: 4th Street – 8th Street Length: XX miles Design Complete: Month Year Construction Complete: October 2018 Construction Cost: $XXXXX Engineering Elements Traffic Engineering Roundabout Design Traffic Signal Design Decorative Street Lighting Plans Traffic Analysis Public Involvement Utility Coordination
2018 WisDOT Excellence in Highway Design Award Finalist for Best Urban Project Type: Reconstruction Client: City of Madison KL’s Role: Prime Consultant Location: Dane County, Wisconsin Limits: Meriter Way to Maple Grove Drive Length: 1.5 miles Design Complete: November 2016 Construction Complete: Fall 2017 Construction Cost: $10.3 Million Engineering Elements Field Survey Drainage / Storm
Type: Bridge Rehabilitation Client: WisDOT Northwest Region (Eau Claire) KL’s Role: Prime Consultant Location: Taylor County, Wisconsin Limits: Medford to Merrill East Fork Little Black River (B-60-44) Length: 0.057 miles Design Complete: February 2018 Construction Complete: November 2018 Construction Cost: $600,000 Engineering Elements Accelerated Design Schedule Traffic & Crash Analysis Field Survey Intersection & Roadway
Type: Bridge Rehabilitation Client: WisDOT Northwest Region (Eau Claire) KL’s Role: Prime Consultant Location: Taylor County, Wisconsin Limits: Thorp to Ingram North Fork Eau Claire River (B-60-33) Length: 0.063 miles Design Complete: February 2018 Construction Complete: November 2018 Construction Cost: $600,000 Engineering Elements Accelerated Design Schedule Traffic & Crash Analysis Field Survey Intersection & Roadway
Great statements from the 23rd Annual NBC 15 Share Your Holidays website: A meal can be the difference between: • A passing and a failing grade on a test in school • Being able to live a healthy lifestyle, or not • A mom being able to share a meal with their child instead of