KL Engineering Logo

Author name: Ryan S

STH 16 (James Street) | City of Columbus

Type: Reconstruction Client: WisDOT Southwest Region (Madison) KL’s Role: Prime Consultant Location: Columbia County, Wisconsin Limits: Industrial Drive to River Road Length: 1.3 miles Design Complete: May 2016 Construction Complete: 2017 Construction Cost: $10.5 Million Engineering Elements Historic District Plans, Specifications & Estimates Design Reports Public Involvement Utility Coordination Drainage / Storm Sewer Design Traffic […]

STH 16 (James Street) | City of Columbus Read More »

IH 41 Mega Project | North Segment

Type: Construction Oversight Client:  WisDOT NE Region KL’s Role: Sub Consultant Location: Brown County, Wisconsin Limits:   Length: 4 miles     Construction Dates: 2013-2017 Construction Cost: $168 Million Engineering Elements Construction Management Construction Observations Construction Documentation Project Finals Quantity Measurement Field Layout / Survey Materials CTH PD Corridor Improvements This project redesigned an existing

IH 41 Mega Project | North Segment Read More »

USH 12 | Baraboo Bypass

Type: Reconstruction Client: WisDOT Southwest Region KL’s Role: Prime Consultant Location: Sauk County, Wisconsin Limits: Terrytown Road to Ski Hi Road Length: 5.3 miles Design Complete: August 2016 Construction Complete: 2017 Construction Cost: $54 Million Engineering Elements Plans, Specifications & Estimate Preliminary & Final Plans Cost Estimate Design Reports Public Involvement Utility Coordination Environmental Analysis

USH 12 | Baraboo Bypass Read More »

IH 39/90 Central Segment

Type: Mega Project Reconstruction Client: WisDOT Southwest Region KL’s Role: Prime Consultant Location: Rock County, Wisconsin Limits: CTH O to Rock-Dane County Line Length: 13 miles Design Complete: November 2018 Construction Complete: XXX Construction Cost: $302 Million Engineering Elements Traffic Analysis Intersection Control Evaluation Reports Interstate Access Justification Reports (IAJR) Roundabout Design Alternate Route Analysis

IH 39/90 Central Segment Read More »

Beloit Safety & Weight Enforcement Facility (SWEF #19)

2009 Statewide ACEC Engineering Excellence Award Finalist Type: Roadside Facility Design Client: WisDOT Central Office KL’s Role: Prime Consultant Location: Rock County, Wisconsin Limits: IH 39/90 Northbound Length: 40-mile Corridor Design Complete: 2008 Construction Complete: 2008 Construction Cost: $XX Million Engineering Elements Location Survey Environmental Analysis / FONSI Agency Coordination / Permits Design Reports Right-of-Way

Beloit Safety & Weight Enforcement Facility (SWEF #19) Read More »

University Avenue (CTH MS) | City of Madison

2013 WisDOT Excellence in Highway Design Award Recipient for Best Urban Project Type: Reconstruction Client: City of Madison KL’s Role: Prime Consultant Location: Dane County, Wisconsin Limits: Allen Boulevard to Segoe Road Length: 1.9 miles Design Complete: October 2011 Construction Complete: 2012 Construction Cost: $12.5 Million Engineering Elements Plans, Specifications & Estimates Design Reports Public

University Avenue (CTH MS) | City of Madison Read More »

STH 67 (Summit Avenue) | City of Oconomowoc

Type: Reconstruction Client: WisDOT Southwest Region KL’s Role: Prime Consultant Location: Waukesha County, Wisconsin Limits: Blue Ribbon Drive to Thackeray Trail Length: 2.5 miles Design Complete: August 2014 Construction Complete: Fall 2016 Construction Cost: $26 Million Engineering Elements Compressed Project Delivery Schedule Plans,  Specifications & Estimate Traffic Analysis Public Involvement Utility Coordination Drainage Analysis Agency

STH 67 (Summit Avenue) | City of Oconomowoc Read More »

Team Members Wanted

KL Brings Safety to Eau Claire Pedestrians

KL Engineering is completing the preliminary design to reconstruct State Street for the City of Eau Claire. Improving safety and the pedestrian  experience are the primary goals for this popular one mile stretch that provides access to downtown and the University of Wisconsin – Eau Claire campus. The preliminary concept includes three mini-roundabouts to improve the traffic flow

KL Brings Safety to Eau Claire Pedestrians Read More »