Author name: Ryan S

Dutch Mill Park & Ride | City of Madison

Type: Parking Lot Expansion Client: WisDOT Southwest Region (Madison) KL’s Role: Prime Consultant Location: Dane County, Wisconsin Limits: Off of USH 51 (Stoughton Road) along USH 12 Length: NA Design Complete: February 2012 Construction Complete: 2012 Construction Cost: $600,000 Engineering Elements Parking Lot Expansion Design Feasibility Study Stormwater Management Drainage & Storm Sewer Analysis Design […]

Dutch Mill Park & Ride | City of Madison Read More »

STH 16 (Cass Street) | City of La Crosse

Type: Reconstruction Client: City of La Crosse KL’s Role: Prime Consultant Location: La Crosse County, Wisconsin Limits: 4th Street – 8th Street Length: XX miles Design Complete: Month Year Construction Complete: October 2018 Construction Cost: $XXXXX Engineering Elements Traffic Engineering Roundabout Design Traffic Signal Design Decorative Street Lighting Plans Traffic Analysis Public Involvement Utility Coordination

STH 16 (Cass Street) | City of La Crosse Read More »

CTH PD (McKee Road)

CTH PD (McKee Road)

2018 WisDOT Excellence in Highway Design Award Finalist for Best Urban Project Type: Reconstruction Client: City of Madison KL’s Role: Prime Consultant Location: Dane County, Wisconsin Limits: Meriter Way to Maple Grove Drive Length: 1.5 miles Design Complete: November 2016 Construction Complete: Fall 2017 Construction Cost: $10.3 Million Engineering Elements Field Survey Drainage / Storm

CTH PD (McKee Road) Read More »

STH 64 Bridge

STH 64 Bridge | Taylor County

Type: Bridge Rehabilitation Client: WisDOT Northwest Region (Eau Claire) KL’s Role: Prime Consultant Location: Taylor County, Wisconsin Limits: Medford to Merrill East Fork Little Black River (B-60-44) Length: 0.057 miles Design Complete: February 2018 Construction Complete: November 2018 Construction Cost: $600,000 Engineering Elements Accelerated Design Schedule Traffic & Crash Analysis Field Survey Intersection & Roadway

STH 64 Bridge | Taylor County Read More »

STH 73 Bridge

STH 73 Bridge | Taylor County

Type: Bridge Rehabilitation Client: WisDOT Northwest Region (Eau Claire) KL’s Role: Prime Consultant Location: Taylor County, Wisconsin Limits: Thorp to Ingram North Fork Eau Claire River (B-60-33) Length: 0.063 miles Design Complete: February 2018 Construction Complete: November 2018 Construction Cost: $600,000 Engineering Elements Accelerated Design Schedule Traffic & Crash Analysis Field Survey Intersection & Roadway

STH 73 Bridge | Taylor County Read More »

Team Members Wanted

Team Members Wanted

KL has two open positions: Traffic Engineer – Entry Level – Madison Office We are looking for an individual who is interested in travel demand modeling and traffic engineering, transportation planning, traffic data collection and evaluation, and electrical and ITS design with a flexible attitude to work on a wide variety of projects. Under supervision,

Team Members Wanted Read More »

Double Your Donation

Double Your Donation

Join us in the fight to eliminate hunger! Tomorrow is the NCB 15 Share Your Holidays Phone-A-Thon, where donations are doubled or even tripled! Get the most food bang for your buck by making a pledge on Wednesday, 12/5! For more details visit (scroll to bottom of page): http://ow.ly/axLZ30mRu9C

Double Your Donation Read More »