Ryan Schanhofer, PE – 10 Years at KL!
We celebrate Ryan Schanhofer, PE on his 10 year anniversary at KL Engineering! He is our Senior Vice President and has 20 years experience in transportation and construction engineering. Congratulations, Ryan!
We celebrate Ryan Schanhofer, PE on his 10 year anniversary at KL Engineering! He is our Senior Vice President and has 20 years experience in transportation and construction engineering. Congratulations, Ryan!
We are excited to have Lynda Fink, PLA join our KL Family! Lynda is a Professional Landscape Architect with 20 years of experience in design, construction and real estate. She will be leading our new Parks, Trails, and Recreation department and will be establishing KL’s new Southeast Wisconsin office.
We celebrate Mike Scarmon, PE, PTOE on his 15 year anniversary at KL Engineering! He is a Senior Project Manager and oversees our Traffic Engineering department. Mike has 18 years experience in transportation design and works in our Madison office. Congratulations, Mike!
Type: Parking Lot Expansion Client: WisDOT Southwest Region (Madison) KL’s Role: Prime Consultant Location: Dane County, Wisconsin Limits: Off of USH 51 (Stoughton Road) along USH 12 Length: NA Design Complete: February 2012 Construction Complete: 2012 Construction Cost: $600,000 Engineering Elements Parking Lot Expansion Design Feasibility Study Stormwater Management Drainage & Storm Sewer Analysis Design
Type: Reconstruction Client: City of La Crosse KL’s Role: Prime Consultant Location: La Crosse County, Wisconsin Limits: 4th Street – 8th Street Length: XX miles Design Complete: Month Year Construction Complete: October 2018 Construction Cost: $XXXXX Engineering Elements Traffic Engineering Roundabout Design Traffic Signal Design Decorative Street Lighting Plans Traffic Analysis Public Involvement Utility Coordination
Type: Lighting Client: City of Appleton KL’s Role: Prime Consultant Location: Outagamie County, Wisconsin Limits: Alicia Park Length: NA Design Complete: September 2017 Construction Complete: December 2017 Construction Cost: $71,000 Engineering Elements Parking Lot & Pathway Lighting Illumination Modeling Lighting Plan & Specification Development Utility Coordination Electrical Service Relocation Project Advertisement Construction Oversight KL Engineering
2016 WisDOT Excellence in Highway Design Award Finalist for Best Urban Design Type: Urban Reconstruction Client: WisDOT Northwest Region (Eau Claire) KL’s Role: Prime Consultant Location: City of Independence, Wisconsin Limits: A Street to Indee Boulevard Length: 1.3 miles Design Complete: August 2013 Construction Complete: 2015 Construction Cost: $6.1 Million Engineering Elements Detour Route Planning
2018 WisDOT Excellence in Highway Design Award Finalist for Best Urban Project Type: Reconstruction Client: City of Madison KL’s Role: Prime Consultant Location: Dane County, Wisconsin Limits: Meriter Way to Maple Grove Drive Length: 1.5 miles Design Complete: November 2016 Construction Complete: Fall 2017 Construction Cost: $10.3 Million Engineering Elements Field Survey Drainage / Storm
Type: Bridge Rehabilitation Client: WisDOT Northwest Region (Eau Claire) KL’s Role: Prime Consultant Location: Taylor County, Wisconsin Limits: Medford to Merrill East Fork Little Black River (B-60-44) Length: 0.057 miles Design Complete: February 2018 Construction Complete: November 2018 Construction Cost: $600,000 Engineering Elements Accelerated Design Schedule Traffic & Crash Analysis Field Survey Intersection & Roadway
Type: Bridge Rehabilitation Client: WisDOT Northwest Region (Eau Claire) KL’s Role: Prime Consultant Location: Taylor County, Wisconsin Limits: Thorp to Ingram North Fork Eau Claire River (B-60-33) Length: 0.063 miles Design Complete: February 2018 Construction Complete: November 2018 Construction Cost: $600,000 Engineering Elements Accelerated Design Schedule Traffic & Crash Analysis Field Survey Intersection & Roadway
Great statements from the 23rd Annual NBC 15 Share Your Holidays website: A meal can be the difference between: • A passing and a failing grade on a test in school • Being able to live a healthy lifestyle, or not • A mom being able to share a meal with their child instead of
We celebrate Gerry Schmitt, PE on his 20 year anniversary at KL Engineering! He has 30 years experience in transportation design and is the Vice President of Planning and Survey Services in our Madison office. Congratulations, Gerry!