USH 8 Trail Feasibility Study

CLIENT

Forest County Potawatomi Community (FCPC)

LOCATION

Forest County, Wisconsin

LIMITS

Crandon & Stone Lake Community

DATES

October 2019 – April 2020

KL Contact

Samantha Herheim, PE

Project Details

  • WisDOT Non-Traditional Project
  • Significant Alternative Analysis
  • Trail Siting for Connectivity with Conflicting Uses
  • Short Time Frame
  • Route Planning
  • Cost Estimating
  • WisDOT Reporting
  • Public Involvement

Bicycle & Pedestrian Path along USH 8

With assistance from a WisDOT planning grant, KL Engineering worked with the Forest County Potawatomi Community (FCPC) to develop a feasibility study to add bicycle and pedestrian facilities along USH 8 in Forest County, WI. The 4.5-mile multi-modal route, called the Pathway to Wellness, would span from S. Prospect Avenue to Otter Creek Road.

The planning project occurred from October 2019 to January 2020 and included data analysis, conceptual planning, public outreach, development of a preferred alternative, and detailed cost estimating. The impetus behind planning for a new bicycle / pedestrian facility was to provide a direct, accessible, and safe off-road transportation option for bicyclists and pedestrians along USH 8.

Three separate alignments were developed for review by staff, WisDOT, and the public. Outreach in the development of the alignments largely included FCPC, WisDOT, the public, adjacent local governments, and the North Central Wisconsin Regional Planning Commission.

With a detailed cost estimate, the next steps for the plan included grant requests, discussions with potential partners of the project, inclusion in long-range planning documents, and implementation in future budgets.