STH 26 / IH 39 Diverging Diamond Interchange

CLIENT

WisDOT Southwest Region & City of Janesville

LOCATION

Janesville, Wisconsin

LIMITS

CTH O to the Rock / Dane County Line (13 miles) in Wisconsin

DATES

November 2011 – November 2017

KL Contact

Brad Halvensleben, PE

Project Details

  • Traffic & Crash Analysis
  • Field & Utility Survey
  • Intersection and Roadway Design
  • Construction Staging / Work Zone TMP
  • Design Reports
  • Utility Coordination / Trans 220
  • Environmental Coordination & Permits
  • Traffic Signal & Lighting Design
  • Public Involvement
  • Transportation Project Plat
  • Plans, Specifications & Estimate

Reimagining a Complex Corridor into a Community Asset

KL Engineering led the 0.9-mile urban reconstruction of STH 26 (Milton Avenue) in Janesville, Rock County, transforming a congested and aging corridor into a modern, multi-modal facility. At the heart of the project is a Diverging Diamond Interchange (DDI), a design that reduces vehicle conflict points, improves traffic flow, and enhances safety for all users.

The DDI was not simply a design choice. It was the right answer to a complex problem. By temporarily crossing traffic to the opposite side of the road, the DDI eliminates the need for left-turn signal phases at the interchange, reducing delays and the potential for serious crashes. For a corridor carrying the volume and variety of traffic that STH 26 sees daily, the impact is significant.

KL Engineering managed every aspect of the project, from topographic and utility surveys to environmental documentation, public involvement, and final PS&E submittal. That full-service approach gave the team the ability to anticipate challenges early and coordinate solutions across disciplines before they became costly problems in the field.

One of the most demanding aspects of the project was maintaining two lanes of active traffic throughout DDI construction. Keeping the corridor open while building a fundamentally new interchange geometry required detailed traffic control staging plans and a Transportation Management Plan (TMP) that balanced construction efficiency with minimal disruption to drivers, businesses, and emergency responders.

The project team approached the corridor with a multi-modal mindset from the beginning. New sidewalks, curb ramps, bike lanes, and a multi-use path were woven into the design, connecting pedestrians and cyclists to the broader network while meeting accessibility standards. In several locations, right-of-way constraints made this work particularly challenging. KL Engineering developed solutions that met design standards while minimizing real estate impacts on adjacent properties.

Lighting was another area where the team went beyond the basics. The final design integrates multiple lighting systems, covering IH 39 interchange lighting, DDI lighting, underpass illumination, and shared electrical services with ITS infrastructure, all coordinated between WisDOT and the City of Janesville. The result is a corridor that is safe and legible for drivers, cyclists, and pedestrians at any hour.

Community Sensitive Solutions (CSS) guided the project from early planning through final design. Public involvement was not a checkbox. It was a genuine effort to understand how the corridor functions for the people who live and work along it, and to reflect those priorities in the design.

The project also required close coordination with utilities, environmental agencies, and local stakeholders. A Transportation Project Plat (TPP) documented right-of-way needs, and retaining walls and sign bridges were designed to fit the urban context without overwhelming it.

The STH 26 / IH 39 DDI project earned recognition as an award-winning effort, and for good reason. It tackled a genuinely difficult engineering challenge and delivered a solution that improves safety, supports multiple modes of travel, and respects the community it serves.

For KL Engineering, it is also a reminder of what is possible when a project team brings curiosity, discipline, and collaboration to every phase of the work. The corridor in Janesville is better for it, and so are the people who use it every day.

2024 National Recognition Winner – ACEC National

2024 Engineering Excellence Best of State Award Winner – ACEC Wisconsin

2023 Engineering Achievement Award Winner – ASCE Wisconsin

2023 Excellence in Highway Design Award Winner – Best Urban Project – WisDOT