When the Madison Metropolitan Sewerage District (MMSD) needed to rehabilitate a 90-year-old sewer interceptor running through one of Madison’s most active corridors, they turned to KL Engineering to manage the traffic and construction complexity that came with it.
The interceptor, a system of 12 to 15-inch clay sewer pipes and rectangular manholes stretching from Segoe Road to Shorewood Boulevard, had reached the end of its useful life. Rehabilitating it required sewer lining, cleaning, and bypassing, all within a corridor shared by commercial businesses, residential apartments, an active railroad, and multiple jurisdictions. From the start, it was clear that the engineering challenge was as much about people and coordination as it was about pipes.
KL Engineering developed a comprehensive Traffic Management Plan (TMP) that addressed both daytime and nighttime work scenarios. To protect businesses and residents along the corridor, most construction operations were structured to occur at night in single-night segments, limiting the footprint of disruption and keeping the corridor functional during the day. Traffic signal programming was adjusted at two key locations to accommodate shifting traffic patterns throughout construction.
One of the more technically demanding aspects of the project fell within 25 feet of an active railroad. KL Engineering managed the required railroad permitting and coordinated on-site flagging to maintain safety throughout those operations. High-density polyethylene (HDPE) pipe fusing for the temporary bypass was performed within the right-of-way. Prefabricated ramps were deployed at key locations to maintain ADA-compliant sidewalk and driveway access for the duration of construction.
Community engagement was central to the project’s success. During the design phase, KL Engineering hosted a property owner “blitz,” meeting directly with dozens of businesses and apartment residents to walk through anticipated impacts to sewer service, driveway access, and parking. We provided work zone exhibits and participated in Public Involvement Meetings to keep stakeholders informed and address concerns before
construction began. Routing alternatives were developed to further reduce community impacts and maintain corridor mobility.
KL Engineering worked closely with the City of Madison, Metro Transit, and the Village of Shorewood Hills to align construction sequencing with broader transportation and transit operations across the region.