KL Engineering Logo

PORTFOLIO

Traffic

Viking Drive & 8th Street Intersection Improvements

CLIENT

City of Reedsburg & Vierbicher (KL as sub to Vierbicher)

LOCATION

Reedsburg, Wisconsin

DATES

February 2018 – September 2019

KL Contact

Matt Regnier, PE, PTOE, RSP1

Project Details

  • Traffic Signal Design
  • Signal Timing Plans
  • Intersection Lighting
  • ADA Compliance Upgrades
  • Construction Oversight & Inspection
  • Intersection Evaluation
  • Signal Warrant Analysis
  • Traffic Data Collection
  • Utility Coordination
  • Pavement Marking Design

Upgrade to Reedsburg Instersection

With increasing traffic volumes and the proximity of the middle school and popular city parks, the City of Reedsburg, WI proactively sought an upgrade to the Viking Drive and 8th Street intersection. KL coordinated with the City of Reedsburg to ensure the City’s specific project goals and long-term planning for the area were fully integrated into the design of a traffic signal.

With multiple lanes on Viking Drive in both directions, KL designed the traffic signal to include monotube signal poles, putting a signal head over each lane to maximize visibility and safety. In addition, the project upgraded pedestrian curb ramps and installed improved crosswalks with pedestrian signals across all legs of the intersection, ensuring local children and citizens have a safe way to navigate this busy route and key intersection in the City of Reedsburg.

RELATED

PROJECTS