KL Engineering Logo

PORTFOLIO

Construction Management

IH 41 North Segment Reconstruction

CLIENT

WisDOT Northeast Region

LOCATION

Brown County, Wisconsin

LIMITS

Memorial Drive to Lineville Rd (9 miles)

DATES

July 2013 – June 2017

KL Contact

Ryan Schanhofer, PE

Project Details

  • Construction Management
  • Construction Observation
  • Construction Documentation
  • Field Layout / Survey
  • Field Modifications
  • Quantity Measurement
  • Project Cost Accounting
  • Material Compliance
  • Public Involvement
  • Stakeholder Coordination

$170 Million WisDOT Mega Project

KL Engineering provided construction administration services for the $170 million reconstruction of IH 41 from Memorial Drive to Lineville Road in Brown County, WI. Services included administration of the contract, documentation and recordkeeping, inspection, material testing and compliance, erosion control compliance, traffic control compliance, contract change orders, public relations, and pay estimates.

The reconstruction project included approximately 4 miles of the IH 41 mainline, the IH 41/IH 43 system interchange, the Velp Avenue Interchange, and the Lineville Road Interchange. Major construction items included steel tub girder and plate girder structures, concrete girder structures, sign structures, significant grading, retaining walls, base aggregate, concrete pavement, asphaltic pavement, curb and gutter, staged traffic control, signing and marking, and roundabouts.

IH 41 North Segment Reconstruction [Photos]

RELATED

PROJECTS