The Fish Hatchery Road Ribbon Cutting Ceremony was last week. KL’s Jesse Schreiner, who oversaw construction for the project, was one of the many presenters. The ribbon was ‘cut’ by a car, driven by Mayor Richardson with County Executive Parisi, and celebrated the opening of a brand new intersection at Bowman Drive / Traceway Drive. KL Engineering is grateful to have been a part of the design and construction of this $22 million project that reconstructed a 1.5 mile segment between April 2020 and November 2021. Many thanks to City of Fitchburg for entrusting us with this project!
Fish Hatchery Road Ribbon Cutting
- | Transportation Projects
![Fish Hatchery Road Ribbon Cutting](https://klengineering.com/wp-content/uploads/2022/12/FHR-Ribbon-Cutting-Ceremony_LI_grp-768x768.png)
Share This Story
Related
NEWS
![Photos of the construction grading for the Powerline Trail path and of construction equipment assisting workers around the water for the fishing pier construction for the Fox River. Project names and community logos over lay the photos.](https://klengineering.com/wp-content/uploads/2024/07/2024-NPRM_GT-Trail-Projects_static-1-1024x1024.jpg)
Parks, Trails & Recreation Projects
![Bright yellow background with Boys and Girls Club of Dane County logo and Move N Groove logo at the top, a photo of 4 bikers wearing neon yellow KL shirts at the finish line, and KL logo at the bottom.](https://klengineering.com/wp-content/uploads/2024/07/2024-Move-N-Groove-Post-1024x1024.jpg)
Community
![Graphic showing a faded photo of 3 people working together with 'Traffic Engineer' in white text overlaid and a white state of Wisconsin shape showing where our 4 office locations are and a red box with 'Mid-Level' and 'Any KL Office' text in white.](https://klengineering.com/wp-content/uploads/2024/07/Traffic-Engineer-1024x1024.jpg)