Here’s our electrical engineering intern, Reid Morauske, onsite getting his hands dirty in preparation for a lighting design and construction project proposal. He’s been working with our electrical specialist, Tony Steinert, to evaluate the existing lighting infrastructure to determine the current conditions, operations, and maintenance requirements of the system. Evaluating the site firsthand provides us with a better understanding of the community’s needs and allows us to develop the unique and tactful approach that we bring to our clients. #ABetterExperience
Preparing for a Proposal
- | Lighting Projects
![Three images of Reid inspecting details of a light pole near a pedestrian crossing, a utility box on a corner, and waving from a parking lot.](https://klengineering.com/wp-content/uploads/2023/09/Lighting_Shorewood_Reid-768x768.jpg)
Share This Story
Related
NEWS
![Photos of the construction grading for the Powerline Trail path and of construction equipment assisting workers around the water for the fishing pier construction for the Fox River. Project names and community logos over lay the photos.](https://klengineering.com/wp-content/uploads/2024/07/2024-NPRM_GT-Trail-Projects_static-1-1024x1024.jpg)
Parks, Trails & Recreation Projects
![Bright yellow background with Boys and Girls Club of Dane County logo and Move N Groove logo at the top, a photo of 4 bikers wearing neon yellow KL shirts at the finish line, and KL logo at the bottom.](https://klengineering.com/wp-content/uploads/2024/07/2024-Move-N-Groove-Post-1024x1024.jpg)
Community
![Graphic showing a faded photo of 3 people working together with 'Traffic Engineer' in white text overlaid and a white state of Wisconsin shape showing where our 4 office locations are and a red box with 'Mid-Level' and 'Any KL Office' text in white.](https://klengineering.com/wp-content/uploads/2024/07/Traffic-Engineer-1024x1024.jpg)