KL Engineering Logo

STH 93 (Osseo Road) | City of Independence

S93-overview

2016 WisDOT Excellence in Highway Design Award Finalist for Best Urban Design

Type:Urban Reconstruction
Client:WisDOT Northwest Region (Eau Claire)
KL’s Role:Prime Consultant
Location:City of Independence, Wisconsin
Limits:A Street to Indee Boulevard
Length:1.3 miles
Design Complete:August 2013
Construction Complete:2015
Construction Cost:$6.1 Million

Engineering Elements

  • Detour Route Planning
  • Design Reports
  • Public Involvement
  • Utility Coordination
  • Drainage / Storm Sewer Design
  • Sanitary Sewer & Water Main
  • Lighting Design
  • Sidewalk Reconstruction
  • Structures & Retaining Walls
  • Environmental Analysis (Hazardous Materials & Environmental Report)
  • Agency & Local Official Coordination
  • Transportation Project Plat
  • Streetscape Design
  • Topographic, Utility & Plat Survey
  • Plans Development
  • Plans, Specifications & Estimate (PS&E)

When KL Engineering developed plans for STH 93 in Independence, Wisconsin, they sought more than just a cost-effective design. The 1.3-mile stretch of roadway passes through 13 intersections, runs by a church and cemetery, crosses a bridge connected to a historic dam below Bugle Lake, and winds through a town center featuring a number of century-old buildings. Closing the bridge—the thoroughfare’s only link between the north and south sections of the city—for rebuilding would force a 24-mile detour on regional road users, and an eight-mile detour on locals. KL Engineering strived to deliver a fiscally viable design that would improve safety, preserve the character of Independence and the integrity of its historic structures, and minimally impede road users and business owners during construction.

S93-alignment

 

S93-sight-distance

 

S93-intersection

Project Evaluation

KL Engineering conducted a thorough evaluation of the route. A ground penetration radar (GPR) survey of the cemetery bolstered design of a six-foot retaining wall along its length. The drive to prevent construction surprises led to the identification beneath a sidewalk of a storage room from a defunct bottling plant, and unveiled numerous other problematic curiosities before the contractor found them.

S93-main-street

 

S93-sidewalk

 

S93-complex-design

Unique Features & Challenges

The many unique features and challenges of this project included:

  • Realigning three in-town roadway curves with poor sightlines and substandard radii
  • Constructing a new bridge with minimal interruption to traffic flow while preserving bridge elements connected to a historic dam
  • Installing temporary railing on the dam for pedestrian use during bridge construction
  • Cutting four feet from the roadway profile alongside the cemetery and installing four retaining wall sections and stairs, in between the retaining walls, without disturbing graves for improved driver sight distance
  • Building over abandoned coal chutes running from the road to buildings
  • Improving aesthetics of the route in a design that embraces bicyclists, pedestrians, and historic structures
S93-visualize-design

 

S93-curb-ramp

 

S93-driveway

 

S93-bridge

 

S93-bridge-approach

 

S93-curve

Streetscaping Design

The streetscape plan was developed after multiple meetings with the local committee to determine the limits of their aesthetic improvements.  A theme was developed through input from local officials and community residents that incorporated decorative lighting with accessories, street furniture, stamped colored concrete, decorative grates for trees planted by the city, a bridge with decorative railings and form liners, and retaining walls along a historic property.

S93-streetscape

 

S93-gas-station

 

S93-church-stairs

 

S93-retaining-walls

Effective Design

KL Engineering’s design met the STH 93 project challenges so effectively that the change order cost associated with the design came in at 0.33% of actual bid levels. The result is a safer, attractive route that accentuates the historical charm and integrity of downtown Independence, Wisconsin.

Project construction began in 2014 and was completed in 2015.

Construction Cost:  $6.1 million.

Share This Story

Related

NEWS

Photo of cookies with light blue frosting background with white KL Engineering logo over a white Top Workplaces logo with a white scalloped edge of frosting. The cookies are individually packaged and stacked in clear snap-top containers.

Celebrating Staff

Photo of Rick with KL logo, Welcome text, and star design on orange background.

Celebrating Staff