CTH C Trail Bridge Placement

CTH C Trail Bridge Placement

Check out this video of the placement of the 175′ clear span bridge over the Des Plaines River.   KL Engineering’s Travis Brush, PE and Lynda Fink, PLA have been working with Kenosha County and Lunda Construction to build the CTH C Trail in Pleasant Prairie. The trail is anticipated to be open in June 2020. https://youtu.be/Xy2PeaITbzM

Share This Story

Related

NEWS

graphic includes the headshot of the person who is being celebrated on a light blue background with grey accents.

Celebrating Staff

Graphic includes a photo of the employee on the job, as well as a quote about their time as an intern. At the bottom left corner, the text "Thank You!" is written above an icon of people celebrating.
Graphic includes a photo of the employee on the job, as well as a quote about their time as an intern. At the bottom left corner, the text "Thank You!" is written above an icon of people celebrating.

Celebrating Staff