Many thanks to Marty Cieslik from Upper Sugar River Watershed Association (USRWA) for joining us yesterday! He discussed the Aluminum Chlorohydrate (ACH) treatment to an 8.3 acre stormwater management pond in Verona. The pond was built in 2004 for the Verona Technology Park and has become an integral part of Wisconsin Brewing Company’s grounds. Consistent algae blooms are a concern for this dog-friendly local brewery, limiting the pond’s use due to poor water quality and potential liability issues associated with Cyanobacteria toxins. Emphasis on meeting TMDL’s in the Madison Lakes region lead to this project, demonstrating the use of aluminum compounds to enhance phosphorus reduction goals. Thanks for sharing your knowledge with our staff!
Brewing Bloom of Insight
- | Celebrating Staff, Company News
![Road Fabrics Speaker Series](https://klengineering.com/wp-content/uploads/2022/12/Speaker-Series_SM-Posts-1-768x644.png)
Share This Story
Related
NEWS
![Photos of the construction grading for the Powerline Trail path and of construction equipment assisting workers around the water for the fishing pier construction for the Fox River. Project names and community logos over lay the photos.](https://klengineering.com/wp-content/uploads/2024/07/2024-NPRM_GT-Trail-Projects_static-1-1024x1024.jpg)
Parks, Trails & Recreation Projects
![Bright yellow background with Boys and Girls Club of Dane County logo and Move N Groove logo at the top, a photo of 4 bikers wearing neon yellow KL shirts at the finish line, and KL logo at the bottom.](https://klengineering.com/wp-content/uploads/2024/07/2024-Move-N-Groove-Post-1024x1024.jpg)
Community
![Graphic showing a faded photo of 3 people working together with 'Traffic Engineer' in white text overlaid and a white state of Wisconsin shape showing where our 4 office locations are and a red box with 'Mid-Level' and 'Any KL Office' text in white.](https://klengineering.com/wp-content/uploads/2024/07/Traffic-Engineer-1024x1024.jpg)