KL Engineering Logo

Impressive Stats on NFHR

Impressive Stats on NFHR

The North Fish Hatchery Road reconstruction project was quite impressive in many ways. Here are just a few:

  • 115,000+ hours went into the design, coordination, and construction of the project
  • 44+ miles of electrical wire was installed – enough to run the length of the Badger State Trail
  • 32,000 square yards of concrete was used – equating to 5 UW-Madison Camp Randall football fields
  • The equivalent of 152,000 traffic control barrels were used – enough to close a traffic lane from Fitchburg to Disney World
  • Over 400 plantings and trees were installed!

And this was all within a 1.6 mile project! #Amazing

Share This Story

Related

NEWS

Photos of Scott Cramer and Nathan Rullman in front of the KL office and of Karen Richardson and Bill Biesmann at the Velo UnderRound commuter station with ‘Madison Bike Week – June 3-10, 2023’ text and 2 small yellow bicycle graphics on teal boxes.

Celebrating Staff

“Structural Engineers: Level Up Your Career – Mid-Level & Senior Level Opportunities Available” title on an orange block with a photo of a long retaining wall with green decorative rail and the KL Engineering logo.

Career Opportunities

Bright yellow background with “Welcome Reid!”, photo of Reid Morauske, and KL logo.

Celebrating Staff