Impressive Stats on NFHR

Impressive Stats on NFHR

The North Fish Hatchery Road reconstruction project was quite impressive in many ways. Here are just a few:

  • 115,000+ hours went into the design, coordination, and construction of the project
  • 44+ miles of electrical wire was installed – enough to run the length of the Badger State Trail
  • 32,000 square yards of concrete was used – equating to 5 UW-Madison Camp Randall football fields
  • The equivalent of 152,000 traffic control barrels were used – enough to close a traffic lane from Fitchburg to Disney World
  • Over 400 plantings and trees were installed!

And this was all within a 1.6 mile project! #Amazing

Share This Story

Related

NEWS

Graphic includes a photo of the employee on the job, as well as a quote about their time as an intern. At the bottom left corner, the text "Thank You!" is written above an icon of people celebrating.

Celebrating Staff

graphic includes the headshot of the person who is being celebrated on a light blue background with grey accents.

Celebrating Staff