KL’s Jim Dzienkowski led construction oversight for the $60 million I-94 reconstruction project in Dunn and St. Croix Counties. This complex project overcame numerous challenges, including constructing lanes with a 3:1 traffic split through 4 stages on the Knapp Hill portion of the project. Over the course of several years, the concrete on this rural highway was replaced, while maintaining 4 lanes of traffic, which required 18 miles of temporary pavement and 3 temporary structures. The final product included 16 miles of roadway reconstruction, 2 interchanges, 6 new bridges, and 2 sign structures. The project was a 2021 WisDOT Outstanding Highway Construction Award Finalist in the Large Contract category, nominated by WisDOT NW Region.
IH 94 Reconstruction Project
- | Awards and Accomplishments
![IH 94 Reconstruction Project](https://klengineering.com/wp-content/uploads/2022/11/2021-Finalist_I-94_JDz-768x768.jpg)
Share This Story
Related
NEWS
![Photos of the construction grading for the Powerline Trail path and of construction equipment assisting workers around the water for the fishing pier construction for the Fox River. Project names and community logos over lay the photos.](https://klengineering.com/wp-content/uploads/2024/07/2024-NPRM_GT-Trail-Projects_static-1-1024x1024.jpg)
Parks, Trails & Recreation Projects
![Bright yellow background with Boys and Girls Club of Dane County logo and Move N Groove logo at the top, a photo of 4 bikers wearing neon yellow KL shirts at the finish line, and KL logo at the bottom.](https://klengineering.com/wp-content/uploads/2024/07/2024-Move-N-Groove-Post-1024x1024.jpg)
Community
![Graphic showing a faded photo of 3 people working together with 'Traffic Engineer' in white text overlaid and a white state of Wisconsin shape showing where our 4 office locations are and a red box with 'Mid-Level' and 'Any KL Office' text in white.](https://klengineering.com/wp-content/uploads/2024/07/Traffic-Engineer-1024x1024.jpg)