KL Engineering Logo

John Nolen Drive Press Announcement

rial view of John Nolen Drive and the Madison shoreline featuring Monona Terrace on top with photo of KL staff by Biden sign below.

KL’s Aaron Steger, Dan Ryan, and Chad Halverson attended the John Nolen Drive project press conference. The project just received another $15.1 million from the federal government to replace this iconic causeway that serves as the gateway to downtown Madison, WI. The John Nolen Drive project is 1 of only 9 across the country awarded grants by the Bipartisan Infrastructure Law’s Bridge Investment Program. KL Engineering is the prime consultant providing engineering services for the redesign of John Nolen Drive while this first phase is focused on replacing the 6 causeway bridges between Lakeside Street and North Shore Drive. The first phase of this project is estimated to cost $30 million and to begin construction in 2025. We are grateful for this grant selection to help move this important project forward.

For more information: Wisconsin State Journal Article

Share This Story

Related

NEWS

Graphic with 'Don't waste food' spelled out with photos of fruit forming the letters on green back ground with orange at the bottom and 'Think before your throw out!' message with KL logo.
Graphic of KL employee Scott DeMeuse and his daughter and dog out on a walk. 'Make it a family affair!' text and American Heart Association logo.
Blue background with golden geometric star shapes, one with KL logo in center. Text reads 'To Our Ops Group, Thank you for everything!"

Celebrating Staff