KL Engineering performed the survey for this 7.5-mile urban and rural roadway resurfacing project between Glenwood City and Boyceville, WI. KL survey crews completed topographic and supplemental surveys, and utility and boundary surveys for multiple intersections, beam guard upgrade locations, and superelevated roadway sections along the project corridor and approximately 50 curb ramps.
This project also included the reconfiguration of the intersection in Boyceville to include traffic signals with safety pre-emption for a nearby train crossing.