Rural Reconstruction – STH 31, Racine County

a divided highway

KL Engineering completed the design of this two-mile segment of STH 31 in Racine County, which expanded STH 31 from a two-lane rural roadway to a four-lane roadway. Four design alternatives were evaluated and presented to the public. The selected alternative constructed two southbound travel lanes of the four-lane alternative. The two lanes were designed to accommodate the future expansion to a four-lane roadway.

For its design of the STH 31 project, KL Engineering was the 2008 WisDOT Excellence in Highway Design Award Winner for Best Rural Design.

The project involved close coordination with WisDOT, Racine County, the Town of Caledonia, Southeast Wisconsin Regional Planning Commission and local residents. Three Public Information Meetings were held prior to selection of an alternative. The project included avoidance of a cemetery and a National Register of Historic Places site, drainage design improvements, design of transitional roadway section through this developing area to minimize right-of-way impacts, utility coordination to avoid high pressure gas mains, and upgrading the Four Mile Road intersection to meet current standards.

KL Engineering completed the project design in two phases and completed the Section 106 process, Environmental Assessment and Finding of No Significant Impact (EA/FONSI)for the ultimate four-lane section, 404 permit, pavement design, storm sewer design and drainage design, retaining walls design, channel relocation design, and utility coordination. Successful completion of the first phase of the project led to WisDOT selecting KL to complete the final design. Construction of this $4.9 million project was completed in 2007.

Share This Story

Related

NEWS

Photos from banquet including one with Aaron Steger, Mike Scarmon, Ryan Schanhofer, and Scott Cramer. And another with Karin Cretney and Shannon Jacobs. A photo of the award in our office along with the special newspaper section.

Awards and Accomplishments

Graphic with photo of KL Engineering employees at the top, a blue strip in the center with the Top Workplaces Award logo in the middle, and a photo of the exterior Madison office on the bottom showing the KL exterior sign.

Awards and Accomplishments