Water Street Bridge – City of Eau Claire

Construction Management

KL Engineering provided the Project Leader and staff for the $7.1 million Water Street Bridge project over the Chippewa River in the City of Eau Claire.  The project included the replacement of the existing steel girder structure with a wider concrete girder structure to accommodate vehicles, bicycles, and pedestrians. 

Specific work items included removals, grading, base aggregate, asphaltic surface, B-18-0219, riprap, erosion control, restoration, signing, traffic control, pavement marking, traffic signals, lighting, and incidentals.  The project was completed in Fall 2016.

 

Project Details

Client: Tera Weiss, P.E., Project Manager
WisDOT
Location: Eau Claire, WI 
Limits: Over the Chippewa River 
Dates: August 2015 – November 2016
KL Contact: Jim Dzienkowski

Project Elements

  • Construction Management
  • Construction Observation
  • Construction Documentation
  • Field Layout/Survey
  • Field Modifications
  • Quantity Measurement
  • Project Cost Accounting
  • Material Compliance
  • Public Involvement
  • Stakeholder Coordination