Water Street Bridge – City of Eau Claire
Construction Management
KL Engineering provided the Project Leader and staff for the $7.1 million Water Street Bridge project over the Chippewa River in the City of Eau Claire. The project included the replacement of the existing steel girder structure with a wider concrete girder structure to accommodate vehicles, bicycles, and pedestrians.
Specific work items included removals, grading, base aggregate, asphaltic surface, B-18-0219, riprap, erosion control, restoration, signing, traffic control, pavement marking, traffic signals, lighting, and incidentals. The project was completed in Fall 2016.
Project Details
Client: | Tera Weiss, P.E., Project Manager WisDOT |
Location: | Eau Claire, WI |
Limits: | Over the Chippewa River |
Dates: | August 2015 – November 2016 |
KL Contact: | Jim Dzienkowski |
Project Elements
- Construction Management
- Construction Observation
- Construction Documentation
- Field Layout/Survey
- Field Modifications
- Quantity Measurement
- Project Cost Accounting
- Material Compliance
- Public Involvement
- Stakeholder Coordination