STH 170, Glenwood City – Colfax, Dunn & St. Croix Counties
Survey

KL Engineering has performed the survey for this 7.5-mile urban and rural roadway resurfacing project between Glenwood City & Boyceville KL Survey Crews completed topographic and supplemental surveys, utility and boundary surveys for multiple intersections, beam guard upgrade locations, and superelevated roadway sections along the project corridor and approximately 50 curb ramps.
This project also includes the reconfiguration and the intersection in Boyceville to include traffic signals with safety pre-emption for a nearby train crossing
Project Details
Client: | Tyler Rongstad, Project Manager WisDOT NW Region |
Limits: | NW Region Wisconsin |
Dates: | June 1, 2018 – January 29, 2021 |
KL Contact: | Gerry Schmitt |
Project Elements
- Full & Supplemental Topographic Survey
- Utility and Storm Sewer Survey Including Measure Downs
- Structure Survey
- Boundary & Property Line Surveys
- Staking for real estate appraisal
- Right of way monumentation
- Railroad Crossing Survey