Type: Site Planning & Stormwater Management Client: Phil Sveum Coldwell Banker Success KL’s Role: Prime Consultant Location: City of Fitchburg, Wisconsin Limits: North Stoner Prairie Neighborhood Length: 19 Acres Design Complete: October 2018 Construction Complete: NA Construction Cost: NA Engineering Elements Amendment to Comprehensive Development Plan (CDP) Regional Planning with Capital Area Regional Plan […]
Category Archives: Site Design | Civil Projects
Type: Site Design & Survey Client: Stone Mill Construction KL’s Role: Prime Consultant Location: Village of West Milwaukee, Wisconsin Limits: NA Length: NA Design Complete: November 2018 Construction Complete: Fall 2019 Construction Cost: NA Engineering Elements Certified Survey Map (CSM) Topographic Survey Geometric Layout Erosion Control Grading Utility Coordination Documentation for Acquiring Permits Construction […]
Type: Site Development Client: MBA Construction KL’s Role: Prime Consultant Location: Lafayette County, Wisconsin Limits: NA Length: NA Design Complete: June 2017 Construction Complete: December 2017 Construction Cost: NA Engineering Elements Erosion Control & Stormwater Permitting – including Preparation of a SWAPPP Coordination with State & Local Officials Site Design & Specification Plan Preparation Surveying […]
Type: Site Development Client: Newcomb Construction KL’s Role: Prime Consultant Location: Dane County, Wisconsin Limits: 2.3 acres Length: NA Design Complete: April 2020 Construction Complete: June 2020 Construction Cost: $475,000 Engineering Elements Expedited Design & Construction Schedule City of Madison Site & Zoning Permitting Stormwater Management Facility Design Site Design Plan & Specification Preparation […]
Yesterday was a great day to set some bridge girders! Special thanks to our partners JSD and Verona Area School District.
Type: Parking Lot Expansion Client: WisDOT Southwest Region (Madison) KL’s Role: Prime Consultant Location: Dane County, Wisconsin Limits: Off of USH 51 (Stoughton Road) along USH 12 Length: NA Design Complete: February 2012 Construction Complete: 2012 Construction Cost: $600,000 Engineering Elements Parking Lot Expansion Design Feasibility Study Stormwater Management Drainage & Storm Sewer Analysis Design […]
KL Engineering was the prime consultant for the design and construction of four bus transfer points located throughout the City of Madison. The bus transfer point facilities were part of the redesign of the bus routing system in Madison. The North Transfer Point included the design of a Park and Ride facility. In 2000 KL […]